ECE 332/332L – Microprocessors Lab   Leave a comment

From : http://coen.boisestate.edu/aplanting/ece332spring2009/lab.htm

Lab 0 (01/27/2009): Getting Started
Prelab: none
Lab: instructions, sof and ptf file
Laboratory Check-off Sheet: not required

Lab 1 (02/03/2009): Memory
Prelab: Read ASM-1 handout
Lab: instructions, tutorial, sof and ptf file
Additional example (zip)
Laboratory Check-off Sheet: not required

Lab 2 (02/10/2009): PIO Devices
Prelab: Read ASM-2 handout
Lab: instructions, sof, ptf and examples
Laboratory Check-off Sheet: not required

Lab 3 (02/17/2009): Count Down Timer
Prelab: none
Lab: instructions, sof/ptf
Laboratory Check-off Sheet: not required

Lab 4 (03/03/2009): Another Count Down Timer
Prelab: none
Lab: instructions, sof/ptf
Laboratory Check-off Sheet: not required

Lab 5 (03/10/2009): LCD Display
Prelab: Altera LCD Controller Core Guide (pdf),
LCD User guide (pdf),
LCD Datasheet (pdf))

Lab: instructions, sof/ptf
Laboratory Check-off Sheet: not required

Lab 6.1 (03/17/2009): Interrupts Part 1
Prelab: none
Lab: instructions, sof/ptf
Laboratory Check-off Sheet: not required

Lab 6.2 (03/31/2009): Interrupts Part 2
Prelab: none
Lab: instructions, sof/ptf
Laboratory Check-off Sheet: not required

Lab 7 (04/14/2009): Software Pulse Width Modulation
Prelab: instructions
Lab: Handout in class, sof/ptf (v2)
Laboratory Check-off Sheet:

Posted July 1, 2010 by ngththien in Uncategorized

Tagged with ,

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: